Heat pump specialists · Cape Town & Western Cape
Ownership

Heat Pump Installation Checklist

What a properly completed installation should include before the technician leaves.

01

Mechanical

Unit level on adequate mounts, anti-vibration isolation fitted, service clearance around the coil, condensate drained away from walls and electrics.

02

Plumbing

Insulated flow and return, isolating valves, correctly positioned check valve, pressure relief arranged safely, no pipework touching structure.

03

Electrical

Dedicated protection correctly rated, accessible isolator, glanded entries, no unsealed penetrations.

04

Commissioning

Recorded operating pressures and temperatures, verified recovery, set-points and schedule configured, and an owner walkthrough covering the controller and what to watch for.

Next step

If you want this assessed on your own property, call 069 268 0988. We inspect, explain what we find, and quote in writing.

Have it looked at properly.

Call 069 268 0988 or email info@reyds.co.za for diagnosis, installation advice or servicing anywhere in Cape Town.